Preventing Over-Design in Bently Nevada Systems: 3 Efficiency Strategies

Preventing Over-Design in Bently Nevada Systems: 3 Efficiency Strategies
This article explores actionable methods to reduce operational complexity in PLC&DCS networks, leveraging Bently Nevada’s System 1™ platform and modular design principles for sustainable cost savings.

Bently Nevada Control System Optimization: 3 Strategies Saving $1.2M Annually

1. Modular Architecture Implementation

• Commissioning time reduced 35% using System 1™ templates (420 labor hours saved at Gulf Coast refinery)
• DCS downtime minimized to 6.2 hrs/month vs industry average 22 hrs through 3500/46M phased integration

2. AI-Driven Component Rationalization

• Machine learning identified 34 redundant PLC I/O points at BASF Ludwigshafen (€31k/year savings)
• Digital twins reduced control logic complexity by 29% across 12 pilot sites

3. Lifecycle Cost Analysis

• Hydro-Québec achieved €2.7M savings over 10 years via APM-optimized transducer inventories
• VFD right-sizing boosted pump efficiency 17% (€126k/year energy savings)

Quantified Results

▶ MTTR improvement: 31% (8.7 → 6.0 hours) at Canadian mining sites
▶ Compliance violations: 63% reduction across 45 EU facilities
▶ Predictive accuracy: 92% bearing failure detection in offshore drills

Industry Success Stories

• Shell Pernis Refinery: 18x faster edge computing (350ms → 19ms latency)
• GE Gas Turbines: Prevented $780k downtime through cloud vibration analysis

Check below popular items for more information in Nex-Auto Technology.

991-06-50-02-05 990-04-50-03-01 330104-05-11-90-11-05
991-06-50-03-05 330104-00-08-90-02-00 330190-045-01-05
990-04-50-03-00 330104-00-03-90-11-05 330190-045-02-00
990-04-50-01-01 330104-00-02-90-01-05 330190-045-02-05
990-04-50-02-01 330104-00-02-90-02-05 330190-045-03-00
Back to blog