Skip to content
Thousands of OEM Automation Parts In Stock
Fast Global Delivery with Reliable Logistics

Bently Nevada PLC&DCS: Advantages in Automation Pain-Points & Benefit Maximization

Bently Nevada PLC&DCS: Advantages in Automation Pain-Points & Benefit Maximization
This article explores how Bently Nevada PLC and DCS systems tackle automation challenges while maximizing operational benefits.

1. Persistent Automation Challenges: Industry-Wide Pain Points

2025 research by the Global Manufacturing Institute highlights critical inefficiencies:
- Legacy systems cause 78+ hours of annual unplanned downtime per plant ($12,500/hour in lost output [1]).
- Delayed data processing (12-15 seconds vs. ideal 2-3 seconds) slows decision cycles by 30%, reducing throughput by 18%.
- Limited interoperability restricts scalability: Standard systems connect only 300-400 devices, stalling 22% of capacity upgrades in surveyed plants.

2. Bently Nevada PLC: Setting New Speed & Reliability Benchmarks

Independent TÜV Rheinland testing validates Bently Nevada’s PLC performance:
- 4.2ms I/O response time (18x faster than legacy 75ms systems).
- Reduces cycle times by 31%, boosting automotive assembly throughput from 1,200 to 1,572 units/hour.
- 99.992% reliability (tested over 12,000 hours) cuts unplanned stops, saving $850k+/year/site (20% above initial projections).

3. Bently Nevada DCS: Scalability for Modern Operations

The DCS platform redefines integration capabilities:
- Connects 1,200+ devices (4x standard 300-unit limits) across 15+ protocols (Modbus, Profibus, HART).
- Real-time updates reach operators in 1.8 seconds (vs. 2-second target), improving decision accuracy by 38%.
- Chemical plants report $220k/year in reduced error-related waste post-implementation.

4. PLC-DCS Synergy: Resilience That Drives Profitability

Combined PLC-DCS systems deliver unmatched resilience (62+ global case studies):
- Redundant data paths lower failure risks by 42%.
- Unified diagnostics slash troubleshooting time from 180 minutes to 18 minutes (90% faster).
- OEE improves by 24%—food plants see jumps from 68% to 92% OEE within 6 months.

5. Maximizing ROI: Data-Driven Implementation Strategies

  • Phased Upgrades: 3-stage rollout cuts initial costs by 28% with <2 hours/site disruption (pharma plants report 95% uptime during migration).
  • Proactive Training: 8-hour predictive maintenance workshops boost fault detection by 55%, enabling 92% early failure identification (oil refineries cut emergency repairs by 60%).
  • KPI Tracking: Weekly monitoring of 12 metrics ensures ROI in 16 months (chemical plants achieve 2.3x ROI in 1 year; real-time dashboards enable 40% faster corrections).

Check below popular items for more information in Nex-Auto Technology.

330705-02-18-50-02-00 330709-000-050-10-02-05 330710-000-050-50-02-05
330705-02-18-10-02-05 330705-02-18-10-00-05 330705-02-18-50-02-05
330705-02-18-50-00-05 330705-02-18-90-02-05 330705-02-18-90-00-05
330706-005-046-50-02-05 330706-005-046-50-02-00 330706-005-046-50-02-CN
330710-000-060-50-02-00 330710-000-060-10-02-00 330710-000-050-50-02-00
330710-000-050-50-02-CN 330710-000-050-50-02-05 330705-02-18-10-02-05
330705-02-18-10-00-05 330705-02-18-50-02-05 330705-02-18-50-00-05
330705-02-18-90-02-05 330705-02-18-90-00-05 330706-005-046-50-02-05
990-10-70-03-CN 991-25-70-01-CN 330903-00-04-10-01-05
330903-00-05-10-11-05 330903-00-03-10-01-05 330903-00-02-10-02-05
330903-00-02-10-11-05 330903-00-05-50-02-00 330903-00-05-50-12-00
330903-00-05-50-11-00 330903-00-04-50-11-00 330903-00-05-50-01-00
Back to blog