TSXCANCADD5 CANopen Cordset | Schneider Electric
Bulk Orders & Fast Shipping
Instant 10% Discount On Winter Banks Credit/Debit Cards EMI and CreditCard
Fast & Reliable Worldwide Shipping – Ready to Dispatch from Stock
- Fast shipping
- Return Policy
- Lowest Price
- Help Center 24/7
-
Vendor:
Schneider
-
Type:
CANopen Cordset
- Tags Canopen cordset
About the Product
Schneider Twido TSXCANCADD5 CANopen Cordset
The TSXCANCADD5 is a 5-meter CANopen cordset designed for medium-distance device connections in industrial networks.
Technical Specifications
- Manufacturer: Schneider Electric / Twido
- Model Number: TSXCANCADD5
- Product Range: CANopen communication accessories
- Bus Protocol: CANopen industrial fieldbus
- Product Type: CANopen cordset assembly
- Accessory Category: Connection accessories
- Function: Connecting cable for device interconnection
- Destination: CANopen bus network connections
- Cable Length: 16.4 feet (5 meters)
- Connector Type: 2 × female SUB-D 9-pin molded connectors
- Certification: CE marked for European compliance
- Ingress Protection: IP20 rating
- Product Weight: 0.97 lb (0.44 kg)
- Operating Temperature: -20°C to +80°C (-4°F to +176°F)
Electrical & Mechanical Properties
- Conductor Size: 22 AWG (0.34 mm²) stranded copper
- Cable Construction: Twisted pair with overall foil/braid shield
- Shield Termination: Connected to connector shells at both ends
- Contact Plating: Gold over nickel plating
- Pin Configuration: Standard CANopen pinout
- Dielectric Strength: 500V AC for 60 seconds
- Cable Diameter: Approximately 6.2 mm (0.244 inches)
- Bend Radius: Minimum 50 mm (2 inches)
- Maximum Voltage: 30V DC continuous
Package Information
- Unit Package (1 PCE): Single cordset unit
- Package Dimensions: 0.8 × 8.3 × 10.6 inches (20 × 211 × 269 mm)
- Package Weight: 15.8 oz (449 grams)
- Bulk Package (10 S02): 10 units per shipping carton
- Carton Dimensions: 5.9 × 11.8 × 15.7 inches (150 × 300 × 399 mm)
- Carton Weight: 9.90 lb (4.49 kg)
Installation & Application
- Connection Purpose: Medium-distance device connections
- Network Topology: Point-to-point in CANopen networks
- Tool Requirements: No special tools needed
- Installation Time: < 1 minute per connection
- Compatibility: Standard CANopen devices with 9-pin D-sub male ports
Shipping & Support
- Shipping Methods: Available via FedEx, UPS, DHL
- Lead Time: Typically ships within 2-4 business days
- Technical Support: Available for installation questions
For compatibility and technical support for the TSXCANCADD5 cordset, contact our team.
Contact Information:
Email: sales@nex-auto.com
Phone/WhatsApp: +86 153 9242 9628
Partner: AutoNex Controls Limited
© 2025 NexAuto Technology Limited. All rights reserved.
Original Source: https://www.nex-auto.com/
Quick Quotes & Info
- Quick Quotes: Receive pricing and availability fast from our dedicated customer service team.
- Delivery: Expedited, freight, and international shipping available worldwide.
- Warranty: NexAuto offers a 12-month warranty on all parts purchased from us, in addition to any manufacturer coverage.
- Returns: 30-day return policy for defective or mismatched parts, ensuring peace of mind.
- Payment: Flexible options including major credit cards, PayPal, and bank transfers.
- Custom Calibration: Provide your specifications, and we’ll handle the rest with precision.

Industrial Electrical Solutions
Comprehensive Automation Equipment for Every Facility
PLCs, HMIs, Servo Drives, Sensors, and Cables for reliable operations.
BENTLEY NEVADA
Condition Monitoring Solutions
Proximity probes, sensors, and monitoring systems to protect critical machinery.
ALLEN-BRADLEY
Industrial Automation Components
High-quality PLCs, HMIs, and I/O modules for reliable control systems.
HONEYWELL
Controllers, I/O & Interface Modules
New parts to support DCS platforms and PLC installations.
Blog posts
-
How Do Extreme Temperatures Impact PLC Cabinet Reliability?
This technical guide examines advanced thermal management solutions for PLC cabinets operating in extreme environments,...
-
Why Is OPC UA the Best Choice for PLC to MES Data Integration?
This article explores the critical role of OPC UA in bridging the gap between shop-floor...
-
Is Time-Sensitive Networking the Key to Future-Proof PLCs?
As factories evolve towards Industry 4.0, traditional fieldbuses struggle with data overload. This article explores...

















