Kabel CANopen Schneider TSXCANCA300
Bulk Orders & Fast Shipping
Instant 10% Discount On Winter Banks Credit/Debit Cards EMI and CreditCard
Fast & Reliable Worldwide Shipping – Ready to Dispatch from Stock
- Fast shipping
- Return Policy
- Lowest Price
- Help Center 24/7
-
Vendor:
Schneider
-
Type:
Kabel CANopen
- Tags Canopen cable
About the Product
Schneider Twido TSXCANCA300 Kabel Standard CANopen, 300m, IP20
Tingkatkan prestasi rangkaian industri anda dengan kabel TSXCANCA300. Ia memastikan komunikasi CANopen yang boleh dipercayai merentasi jarak jauh.
Spesifikasi Teknikal
| Jenis Produk | Kabel CANopen |
| Jenis Bas | CANopen |
| Jenis Aksesori | Kabel penyambung |
| Panjang Kabel | 984.3 ft (300 m) |
| Perlindungan IP | IP20 |
| Berat Produk | 54.15 lb(US) (24.56 kg) |
| Piawaian | IEC 60332-1 |
Maklumat Pakej
Jenis Unit 1: 1 PCE, 13.189 in x 15.551 in x 15.551 in, 54.146 lb(US) (24.560 kg)
Jenis Unit 2: 18 P12, 44.488 in x 31.496 in x 47.244 in, 1000.899 lb(US) (454.000 kg)
Quick Quotes & Info
- Quick Quotes: Receive pricing and availability fast from our dedicated customer service team.
- Delivery: Expedited, freight, and international shipping available worldwide.
- Warranty: NexAuto offers a 12-month warranty on all parts purchased from us, in addition to any manufacturer coverage.
- Returns: 30-day return policy for defective or mismatched parts, ensuring peace of mind.
- Payment: Flexible options including major credit cards, PayPal, and bank transfers.
- Custom Calibration: Provide your specifications, and we’ll handle the rest with precision.

Industrial Electrical Solutions
Comprehensive Automation Equipment for Every Facility
PLCs, HMIs, Servo Drives, Sensors, and Cables for reliable operations.
BENTLEY NEVADA
Condition Monitoring Solutions
Proximity probes, sensors, and monitoring systems to protect critical machinery.
ALLEN-BRADLEY
Industrial Automation Components
High-quality PLCs, HMIs, and I/O modules for reliable control systems.
HONEYWELL
Controllers, I/O & Interface Modules
New parts to support DCS platforms and PLC installations.
Blog posts
-
How Do Extreme Temperatures Impact PLC Cabinet Reliability?
This technical guide examines advanced thermal management solutions for PLC cabinets operating in extreme environments,...
-
Why Is OPC UA the Best Choice for PLC to MES Data Integration?
This article explores the critical role of OPC UA in bridging the gap between shop-floor...
-
Is Time-Sensitive Networking the Key to Future-Proof PLCs?
As factories evolve towards Industry 4.0, traditional fieldbuses struggle with data overload. This article explores...

















